{"id":740,"date":"2026-09-12T09:30:00","date_gmt":"2026-09-12T06:30:00","guid":{"rendered":"https:\/\/anegersirethymnou.gr\/what-to-know-before-building-your-home\/"},"modified":"2026-10-10T09:26:26","modified_gmt":"2026-10-10T06:26:26","slug":"what-to-know-before-building-your-home","status":"publish","type":"post","link":"https:\/\/anegersirethymnou.gr\/en\/what-to-know-before-building-your-home\/","title":{"rendered":"What to know before you start building your home"},"content":{"rendered":"<p>Building a new home is a major step that brings together personal needs, architectural design, technical decisions and financial planning.<\/p>\n<p>Whether it is a permanent home, a holiday home or a property for tourist rental, the success of the project depends to a great extent on the preparation that comes before it.<\/p>\n<p>Especially when you are planning <strong>to build a home in Rethymno or elsewhere in Crete<\/strong>, it is important to take into account local conditions, the characteristics of the plot, the energy performance of the building and your real needs.<\/p>\n<p>So what should you know before work begins? Here are ten key points worth considering from the start.<\/p>\n<h2>1. Define your real needs<\/h2>\n<p>Before the architectural design begins, it is important to have a clear picture of how you want to use your future home.<\/p>\n<p>How many bedrooms do you need? Do you want open-plan or separate spaces? Do you need a study, a storage room, a guest room or more outdoor space?<\/p>\n<p>It is just as important to think about your future needs.<\/p>\n<p>A home should be designed not only around how you live today, but also with how well it will work over the years in mind.<\/p>\n<p>Discussing these points with your architect from the early stages can prevent changes during construction.<\/p>\n<h2>2. Check the plot carefully<\/h2>\n<p>Choosing and assessing the plot is the foundation of every building project.<\/p>\n<p>Even if you already own the property, its planning and technical characteristics need to be examined before the design is finalised.<\/p>\n<p>Among other things, the engineer should assess:<\/p>\n<ul>\n<li>the building regulations that apply,<\/li>\n<li>the shape and slope of the ground,<\/li>\n<li>access to the site,<\/li>\n<li>the orientation of the plot,<\/li>\n<li>the foundation requirements,<\/li>\n<li>any special restrictions in the area.<\/li>\n<\/ul>\n<p>In Crete, where many plots have steep level differences or particular landforms, these characteristics can significantly affect both the architectural solution and the complexity of construction.<\/p>\n<h2>3. Pay particular attention to the architectural design<\/h2>\n<p>Architectural design is not only about how a house looks from outside.<\/p>\n<p>It determines the layout of the interior, functionality, natural light, ventilation, orientation and the whole experience of living in the home.<\/p>\n<p>Good design makes the most of the plot and adapts to the owners\u2019 needs.<\/p>\n<p>For example, when <strong>building a house in Crete<\/strong>, making the most of the view, protecting the house from the strong summer sun and creating usable outdoor spaces are often key parts of the design.<\/p>\n<p>It is better to spend more time on the design than to face major changes once the project is already under way.<\/p>\n<h2>4. Set a realistic budget<\/h2>\n<p>One of the most common mistakes before building a home is calculating the cost on square metres alone.<\/p>\n<p>In reality, the overall budget is affected by many more factors.<\/p>\n<p>Beyond the main construction, you need to consider:<\/p>\n<ul>\n<li>design work and the related fees,<\/li>\n<li>the necessary permits and approvals,<\/li>\n<li>earthworks,<\/li>\n<li>technical installations,<\/li>\n<li>materials and finishes,<\/li>\n<li>connections to utility networks,<\/li>\n<li>landscaping of the grounds,<\/li>\n<li>any additional work.<\/li>\n<\/ul>\n<p>It is also useful to keep some financial headroom for the unexpected.<\/p>\n<p>A proper cost estimate should be based on the design and the specific specifications of the home, not just on a general estimate per square metre.<\/p>\n<h2>5. Make sure the necessary designs and permits are in place<\/h2>\n<p>Before building work starts, the necessary design and permit procedures must have been completed.<\/p>\n<p>Depending on the project, you may need:<\/p>\n<ul>\n<li>an architectural design,<\/li>\n<li>a structural design,<\/li>\n<li>mechanical and electrical designs,<\/li>\n<li>an energy performance study,<\/li>\n<li>a building permit,<\/li>\n<li>additional approvals from the relevant authorities, where required.<\/li>\n<\/ul>\n<p>Coordinating the different designs is particularly important, as it allows technical issues to be dealt with in good time.<\/p>\n<p>A thorough design process makes for a smoother transition from design to actual construction.<\/p>\n<h2>6. Choose the right building materials<\/h2>\n<p>The choice of materials affects the look, durability, energy performance and future maintenance needs of the house.<\/p>\n<p>Not every choice needs to be in the most expensive category. What matters is that the materials suit the specific project.<\/p>\n<p>Particular care is needed with:<\/p>\n<ul>\n<li>thermal insulation materials,<\/li>\n<li>waterproofing systems,<\/li>\n<li>external windows and doors,<\/li>\n<li>cladding and flooring,<\/li>\n<li>materials exposed to the weather.<\/li>\n<\/ul>\n<p>In coastal areas of Rethymno and Crete, for example, you also need to assess how certain materials behave against humidity, salt and constant exposure to the outdoors.<\/p>\n<h2>7. Plan the energy performance of the home properly<\/h2>\n<p>Energy performance is a key part of modern construction.<\/p>\n<p>Orientation, thermal insulation, windows, shading and heating and cooling systems should be considered together from the early stages of design.<\/p>\n<p>An energy-efficient home can offer better living conditions and lower energy needs over the years.<\/p>\n<p>Especially in the climate of Crete, good bioclimatic design can do a lot to limit overheating in the summer months, without overlooking the needs of winter.<\/p>\n<h2>8. Plan the outdoor spaces early<\/h2>\n<p>One thing that is often left until the end is the design of the outdoor spaces.<\/p>\n<p>Yet a new home can include much more than the main building.<\/p>\n<p>Pergolas, fencing, parking, a pool, paving, planting and outdoor seating areas are all important parts of the overall project.<\/p>\n<p>Planning them early helps to coordinate the work better and gives a more complete picture of the budget.<\/p>\n<p>This is particularly important for holiday homes and tourist properties in Crete, where outdoor spaces are often an integral part of the architecture.<\/p>\n<h2>9. Choose the right construction company<\/h2>\n<p>Building a home requires many trades working together, good organisation and continuous technical supervision.<\/p>\n<p>That is why <a href=\"https:\/\/anegersirethymnou.gr\/en\/how-to-choose-the-right-construction-company\/\">choosing a construction company<\/a> is a decision that deserves particular care.<\/p>\n<p>Before you award the project, look at:<\/p>\n<ul>\n<li>the company\u2019s experience with similar projects,<\/li>\n<li>completed projects,<\/li>\n<li>the organisation of the technical team,<\/li>\n<li>how the site is supervised,<\/li>\n<li>how clear the technical proposal is,<\/li>\n<li>how the owner is kept informed.<\/li>\n<\/ul>\n<p>A well-organised collaboration gives the owner a clearer picture of how the project is progressing and makes it easier to handle any changes.<\/p>\n<h2>10. Agree on the schedule and procedures from the start<\/h2>\n<p>Before construction of the home begins, there should be a basic plan of the work.<\/p>\n<p>The schedule should set out the main stages of the project, from site preparation and the load-bearing structure to the installations, finishes and final handover.<\/p>\n<p>How any changes will be handled should also be agreed.<\/p>\n<p>For example, if during construction you decide to change a material or add some work, it is important to know how this affects the budget and the schedule.<\/p>\n<p>Clear communication from the start creates better conditions for a smooth collaboration.<\/p>\n<h2>Frequently asked questions before building a home<\/h2>\n<h3>Where should I start if I want to build a house?<\/h3>\n<p>The first step is to define your needs and available budget, and to work with an engineer to assess the plot and prepare a preliminary design for the home.<\/p>\n<h3>Do I need complete drawings before asking for a quotation?<\/h3>\n<p>A first estimate can be made with preliminary information. However, the more complete the design and the clearer the technical specifications, the more reliable the quotation can be.<\/p>\n<h3>How long does it take to build a home?<\/h3>\n<p>It depends on the size and complexity of the project, the shape of the plot, the availability of materials and the scheduling of the trades. A realistic schedule has to be drawn up separately for each project.<\/p>\n<h3>Can I make changes after construction starts?<\/h3>\n<p>Changes are often possible, but depending on the stage of the project they may affect the budget or the schedule, or require additional design work and approvals. That is why it is better to make the key decisions before work begins.<\/p>\n<h2>Conclusion<\/h2>\n<p><strong>Building a home<\/strong> starts long before the first building work.<\/p>\n<p>A proper assessment of the plot, thorough architectural and technical design, a realistic budget and the right partners are the key elements for a project to go well.<\/p>\n<p>The more decisions are made correctly from the start, the more organised construction can be, limiting unnecessary changes and unforeseen difficulties.<\/p>\n<div class=\"article-cta\">\n<h2>Planning to build your home in Rethymno or elsewhere in Crete?<\/h2>\n<p><a href=\"https:\/\/anegersirethymnou.gr\/en\/contact\/\">Contact us<\/a> to discuss the needs of your project and look at the right steps for organising and building your new home, from the initial design to the completion of construction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Getting ready to build a house in Rethymno or elsewhere in Crete? Here is what you should know before you start building your home.<\/p>\n","protected":false},"author":1,"featured_media":1056,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[],"class_list":["post-740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction"],"acf":[],"_links":{"self":[{"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/posts\/740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/comments?post=740"}],"version-history":[{"count":0,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/posts\/740\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/media\/1056"}],"wp:attachment":[{"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/media?parent=740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/categories?post=740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anegersirethymnou.gr\/en\/wp-json\/wp\/v2\/tags?post=740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}